Day’s programme
You will visit the outdoor areas, the concrete batching plant, the sludge dewatering plant, the excavation material processing and the tunnel through the north portal. You will go by foot from the facilities at the north portal to the inside of the tunnel. The tunnel is being excavated in loose rock. As an auxiliary construction measure, jet grouting umbrellas have been formed up to stage 41, which have been replaced by pipe umbrellas from stage 42 due to local conditions.
Timetable
07.00 | Meeting at the Inseli car park (behind KKL Lucerne) |
07.05 | Departure in Lucerne (bus) |
09.50 | Arrival in Les Evouettes, welcome at the construction site |
10.00 | Presentation by the consortium about the whole project and the work undertaken |
11.00 | Division into 2 groups and change of clothes - Guided tour of north portal construction site |
12.30 | End of tours, change of clothes, drive by coach to the restaurant (10 min.) |
12.45 | Lunch in a restaurant |
14.15 | approx. return journey to Lucerne by coach |
17.00 | Approximate arrival in Lucerne |
Organisational
- Boots, overcoats and helmets will be available.
- The programme is subject to change depending on the site operation requirements.
- The number of participants is limited.