Tunnel Les Evouettes

03.06.2022
Wallis

Day’s programme

You will visit the outdoor areas, the concrete batching plant, the sludge dewatering plant, the excavation material processing and the tunnel through the north portal. You will go by foot from the facilities at the north portal to the inside of the tunnel. The tunnel is being excavated in loose rock. As an auxiliary construction measure, jet grouting umbrellas have been formed up to stage 41, which have been replaced by pipe umbrellas from stage 42 due to local conditions.

 

Timetable

07.00

Meeting at the Inseli car park (behind KKL Lucerne)

07.05

Departure in Lucerne (bus)

09.50

Arrival in Les Evouettes, welcome at the construction site

10.00

Presentation by the consortium about the whole project and the work undertaken

11.00

Division into 2 groups and change of clothes

- Guided tour of north portal construction site

12.30

End of tours, change of clothes, drive by coach to the restaurant (10 min.)

12.45

Lunch in a restaurant

14.15

approx. return journey to Lucerne by coach

17.00

Approximate arrival in Lucerne

 

Organisational

  • Boots, overcoats and helmets will be available.
  • The programme is subject to change depending on the site operation requirements.
  • The number of participants is limited.

 

< Back